Load Extension/Reduction Service

Load Extension/Reduction Services from Discom

Our team provides expert assistance in applying for sanctioned load extension or reduction with your electricity distribution company (Discom). Whether you're scaling up operations or optimizing existing power needs, we streamline the complete process for industrial, commercial, and residential connections.

We coordinate documentation, liaise with authorities, and ensure smooth inspections and approvals—helping you avoid delays and compliance issues.

What We Offer

  • Load enhancement for commercial/industrial growth
  • Load reduction to cut fixed demand charges
  • Application drafting and submission
  • Discom coordination and follow-ups
  • Feasibility study guidance
  • On-site inspection preparation
  • End-to-end documentation
  • Post-approval support

Our Process

Consultation
Initial Consultation

Assessment of your load requirement and site condition.

Execution
Application & Liaison

Preparing and submitting application to Discom and handling technical approvals.

Completion
Implementation

Final load update and confirmation with Discom records.

Frequently Asked Questions

Typically, the process takes 2–6 weeks depending on the Discom, location, and type of connection.

Electricity bill, sanctioned load proof, site ownership proof, and load calculation sheets are typically required.

Yes, Discom typically conducts a physical inspection before granting approval.